









Vesgantti Twin Mattress, 12 Inch Hybrid Twin Size Mattress in a Box, Single Bed Pillow Top Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Feel
By Vesgantti
Last checked 6mo ago
(171 reviews)
0
$279.99
ASIN:
B0CC5CMNBF
Product ID:
75695
Price History
Current Price
$
Highest Price
$-Infinity
Lowest Price
$Infinity
Product Recommendation
Check Out the Vesgantti Twin Mattress for a Cozy Night's Sleep!
For just $279.99, the Vesgantti Twin Mattress offers incredible value with its array of top-notch features:
- ▶Medium-Firm Plush Feel for a comfy sleep
- ▶Individual Pocket Spring system supports every part of your body
- ▶Breathable and Healthy design keeps you cool and dry
- ▶Ultra Quiet mattress absorbs noise and vibrations
- ▶Vacuum Rolled Packed for easy delivery and setup
At its current price, this mattress is a steal for the quality it offers. Say goodbye to back and neck pains with Vesgantti's innovative design. Don't miss out on this deal - your body will thank you after a night's rest on this gem!
Key Features
- ▶【Medium-Firm Plush Feel】- Fully expanded 755312 inch(LWH) approx. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
- ▶【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- ▶【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- ▶【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- ▶【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)








