Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 1
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 1
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 2
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 3
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 4
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 5
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 6
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 7
Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10" - Image 8

Vesgantti Queen Size Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"×80"×10"

By Vesgantti
Last checked 5mo ago
(54 reviews)
0
$229.99
ASIN:
B07D538WH3
Product ID:
14604

Price History

Current Price
$
Highest Price
$-Infinity
Lowest Price
$Infinity

Product Recommendation

Experience Unmatched Comfort with the Vesgantti Luxury Pocket Spring Mattress

Transform your sleep with the Vesgantti Luxury Pocket Spring Mattress, engineered for superior support and unparalleled comfort. Featuring hundreds of individual stainless steel pocket springs, this mattress adapts to your body’s contours, delivering targeted support to seven key areas—feet, legs, hips, waist, shoulders, neck, and head. Each spring works independently to absorb shock, promote spinal alignment, and correct sleeping posture for a truly restorative night’s rest.

The advanced memory foam and pocket spring support system provides exceptional cushioning to relieve back pain and enhance sleep quality. Made with high-density, temperature-sensitive foam, this mattress is fiberglass-free, breathable, and cooling—keeping you dry and comfortable all night by wicking away sweat.

Enjoy peaceful, undisturbed sleep thanks to the ultra-quiet design that absorbs motion and noise from tossing and turning. Whether you share your bed or are a light sleeper, this mattress ensures minimal disruption for you and your partner.

Conveniently delivered in a vacuum-sealed roll-packed box, the mattress is easy to transport and set up. Simply unbox, allow 48 hours for full expansion, and revel in its plush thickness for a luxurious sleep experience.

Priced at just $229.99, the Vesgantti Luxury Pocket Spring Mattress offers premium comfort without compromise. Upgrade your sleep today—your body will thank you!

Key Features

  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base. Please note: once the mattress open and restore, it cannot be roll back again

Related Products

View More